Skyline Sanitary Sewer Project

Application Information & Forms: 

  • Sewer Connection Ordinance – Regulations governing the requirements to connect to the Township’s public sewer.
  • Application for Sewer Connection – Permit application to be submitted by property owner or their contractor with the sewer connection fee and inspection fee
  • Sewer Connection Fee Payment Plan Application- Form authorizing payment plan for the sewer connection application fee. Form to be submitted with application for sewer connection.
  •  Certificate of Septic Abandonment – This form is completed by your contractor and submitted by them to the Township Health Department at the time the septic tank is abandoned.

Construction Plans & Details:

  • Skyline Sewer Project – This plan details the overall project limits and identifies which properties are to have a gravity connection or a pump connection.
  • Skyline Construction Plans – This document contains the full set of construction plans and has information on the location and depth of the sewer main to be constructed by the Township.
  • E-One Grinder Pump – The document contains manufactures information about the E-One Grinder pump that is being provided by the Township as part of this project.
  •  Construction Details – This document contains detail information about how the Township will be constructing the individual house connection points which will be located at the road right of way. Also included is a detail on the installation of the E-One pump.
  1. Joseph Vuich

    Consulting Township Engineer

  2. Patrica Dannhardt

    Assistant Township Engineer

  3. Joseph Schwab

    Project Manager

  4. Erin Doherty

    Assistant Zoning Officer/Secretary / Notary

  5. Wilson Maya

    Inspector / JR Design Engineer

  6. Bill Hutchinson

    Inspector

  7. Michael Sarno

    Inspector

  8. Engineering

    Physical Address
    50 Woodland Avenue
    Morristown, NJ 07960

    Mailing Address
    50 Woodland Avenue
    PO Box 7603
    Convent Station, NJ 07961-7603