Sewer Connection Ordinance – Regulations governing the requirements to connect to the Township’s public sewer.
Application for Sewer Connection – Permit application to be submitted by property owner or their contractor with the sewer connection fee and inspection fee
Sewer Connection Fee Payment Plan Application- Form authoring payment plan for the sewer connection application fee. Form to be submitted with application for sewer connection.
Certificate of Septic Abandonment – This form is completed by your contractor and submitted by them to the Township Health Department at the time the septic tank is abandoned.
Construction Plans & Details:
Skyline Sewer Project – This plan details the overall project limits and identifies which properties are to have a gravity connection or a pump connection.
Skyline Construction Plans – This document contains the full set of construction plans and has information on the location and depth of the sewer main to be constructed by the Township.
E-One Grinder Pump – The document contains manufactures information about the E-One Grinder pump that is being provided by the Township as part of this project.
Construction Details – This document contains detail information about how the Township will be constructing the individual house connection points which will be located at the road right of way. Also included is a detail on the installation of the E-One pump.